翻訳と辞書 |
Gain scheduling : ウィキペディア英語版 | Gain scheduling In control theory, gain scheduling is an approach to control of non-linear systems that uses a family of linear controllers, each of which provides satisfactory control for a different operating point of the system. One or more observable variables, called the ''scheduling variables'', are used to determine what operating region the system is currently in and to enable the appropriate linear controller. For example in an aircraft flight control system, the altitude and Mach number might be the scheduling variables, with different linear controller parameters available (and automatically plugged into the controller) for various combinations of these two variables. A relatively large scope state of the art about gain scheduling has been published in (Survey of Gain-Scheduling Analysis & Design, D.J.Leith, WE.Leithead).〔(【引用サイトリンク】accessdate=1 November 2012 )〕 == References ==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Gain scheduling」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|